Skip to main content

Decision Framework

Structure complex decisions with criteria weighting, risk analysis, and clear recommendations

StrategyAnalysis

About the Decision Framework Prompt Template

This operations template assigns the AI the role of a strategic advisor and decision analysis expert, so the prompt it builds is framed by genuine subject-matter expertise rather than a generic request.

What it does: Help me make a well-structured decision about your decision topic by evaluating the options against weighted criteria.

You fill in 6 fields (4 required, 2 optional), and SurePrompts assembles a complete, structured prompt you can paste straight into ChatGPT, Claude, or Gemini.

Streamline operations with AI-generated documentation, SOPs, reports, and process guides.

How to Use This Template

  1. 1

    Fill in Decision

    e.g., Which CRM platform should we adopt? Should we hire or outsource?

  2. 2

    Fill in Options to Evaluate

    List each option on a new line (e.g., Option A: Salesforce, Option B: HubSpot, Option C: Build in-house)

  3. 3

    Fill in Decision Criteria

    Factors to evaluate (e.g., cost, scalability, team adoption speed, integration complexity)

  4. 4

    Fill in Context & Constraints

    e.g., Budget is $50K/year, team of 15, must integrate with Slack and Jira

  5. 5

    Fill in Decision Timeline

    Enter the decision timeline for your prompt.

  6. 6

    Fill in Risk Tolerance

    Enter the risk tolerance for your prompt.

  7. 7

    Copy your prompt

    Click the copy button to copy your generated prompt, then paste it into your preferred AI tool.

Template Fields

Every field below maps to a part of the finished Decision Framework prompt. Required fields shape the core request; optional fields add detail and control.

DecisiontextRequired

A required input that takes a short line of text.

Example: e.g., Which CRM platform should we adopt? Should we hire or outsource?

Options to EvaluatemultilineRequired

A required input that takes a longer, multi-line value.

Example: List each option on a new line (e.g., Option A: Salesforce, Option B: HubSpot, Option C: Build in-house)

Decision CriteriamultilineRequired

A required input that takes a longer, multi-line value.

Example: Factors to evaluate (e.g., cost, scalability, team adoption speed, integration complexity)

Context & ConstraintsmultilineRequired

A required input that takes a longer, multi-line value.

Example: e.g., Budget is $50K/year, team of 15, must integrate with Slack and Jira

Decision Timelineselect

An optional input that takes one option from a list. Choose from 4 preset choices.

Available choices:

This weekThis monthThis quarterNo deadline
Risk Toleranceselect

An optional input that takes one option from a list. Choose from 3 preset choices.

Available choices:

Low — minimize risk at all costsMedium — balanced risk/rewardHigh — willing to take big bets

Related Templates